Fabricate pipework between 500NB-700NB.

October 2025

Value: $538,000

 

The following scope of work was carried out:​

  • Supply and fabrication of piping spools.

  • Supply of bolts and gaskets

  • 5% NDT of welds.

  • Hydrotesting.

  • Internal lining of spools with Hempadur 85671

  • Painting of piping spools (3 -coat system)

  • Supply and installation of flange and pipe protectors

  • QA and MDR as applicable (ITP, WPS, Material certs and MDR)

HDD Manifold Pipework for Santos