250 Fuel Gas Skids for Woodgroup

Fabrication of pipework, structural frames & assembly for 250 HPU fuel gas skids for Woodgroup/QGC.

November 2016

Value: $1,487,000.00

 

The following scope of work was carried out:​

  • Procurement of pipe & fittings.

  • Fabrication of piping.

  • Non-destructive testing of piping.

  • Hydrostatic testing of piping.

  • Supply of structural steel & accessories.

  • Surface treatment of all pipework to specification.

  • Galvanizing of structural steel works.

  • Assembly of pipework, valves & instruments onto fabricated skid.

  • Insulation added to skid by third party in IIM workshop.

  • Dispatch pipework.