Fabricate & assemble large skid frames
November 2023
Value: $4,648,000
The following scope of work was carried out:
-
Supply and fabrication of piping spools, shoes, supports & skid frames
-
Supply of bolts and gaskets
-
10% NDT of welds.
-
Hydrotesting.
-
Painting of piping spools (2 -coat system)
-
Assembly of completed spools onto skid frames.
-
Assembly of completed skids inline to assure alignment is correct.
-
Supply and installation of flange and pipe protectors
-
Packaging ready for transport to site
-
QA and MDR as applicable (ITP, WPS, Material certs and MDR)