top of page
Degasser Skids for Santos
Supply five (5) sets of Degasser skids and piping for Santos Ltd.
November 2014.
Value: $500,000.00
The following scope of work was carried out:
-
Procure all piping, bolts, gaskets and structural materials.
-
Fabrication of skid frames and piping.
-
Non-destructive testing of piping.
-
Hydrostatic testing of piping.
-
Surface treatment of all skid frames and pipework to Santos specifications.
-
Complete assembly of skid packages.
-
Dispatch skid packages.
DSCF0752
DSCF0758
IMG_20150508_081553
DSCF0752
1/9
bottom of page